Communication Tools
April 28, 2023
Incident Action Plan (IAP) Builder
The Incident Action Plan Tool can be used to prepare a set of structured courses of action with defined goals and times.
Navigation
- Open the IAP Builder Tool by accessing it from the Menu list (Menu > Communication > IAP Builder).
- An Operational Period’s progress can be recorded by filling in the Forms assigned to that Operational Period.
- Some of the Forms will remain the same for each Operational Period and can be copied in their entirety.
- Other Forms can be partially filled out and copied into appropriate periods.
- File attachments can be added to an Operational Period, including some ICS form reference mapped elements. These can be attached to the appropriate Operational Period.
- Operation Periods will stack up chronologically on the left-hand side and when selected will accordion open to show the contents.
- Forms and attachments can be added to a generic “No Operational Period” section for future use.
Comments
0 comments
Please sign in to leave a comment.